Remote Tech Support

  • Subscribe to our RSS feed.
  • Twitter
  • StumbleUpon
  • Reddit
  • Facebook
  • Digg

Monday, 12 April 2010

Speednet Communication problem

Posted on 20:39 by Unknown
At the very outset, confirm the following and then proceed with further instructions.




• Login to www.indiapost.gov.in/spc site and confirm that the said office is added as Linked Office to SPC.



• Also confirm that under Configure Linked Office – the details of the office is furnished in full.



• Go to SpeedNet MIS page, select your Circle, Region, Division and then SPC and select a long period say a month and confirm that still the office name is not figuring.



Now do the following.



At SPC and Linked Offices which are computerised with Internet connection :



Please confirm the following:



1. If the Booked articles MIS has to come then booked articles messages have to be sent to Central Server.



It is possible when -



1. Point of Sale and SpeedNet are connected through network and Point of Sale Server Name (not the POS Server path) is correctly configured by the SpeedNet Supervisor under Master->Environment->Folder Path option.



2. Point of Sale and SpeedNet are NOT connected through network, then SpeedNet booked Data can be downloaded to Floppy or Pen Drive from POS Supervisor menu option, it should be uploaded into SpeedNet through Floppy data Upload option.



SpeedNet Booked Data of Point of Sale package, can also be downloaded into a Shared folder in Server or client system and the SpeedNet operator can use the Floppy Data Upload option and select the Shared Folder for upload instead of floppy.



Or



The booked articles should be collected in SpeedNet with full Booking details. (Receipts->Collect Articles with Booking Details)



Note:



If any linked office is booking speed articles but not using the SpeedNet Package for closing the Bags and dispatching etc (as those articles are sent to intermediate office or SPC without closing the bag), they may install the Communication package for POS instead of SpeedNet so that booked messages will be directly transmitted to MIS from the POS itself. In POS Office details the office pincode should be correct and if it is a non delivery office – the non delivery code should be configured as configured in the SPC site as linked office.



3. Delivery MIS will be available; if the Articles are invoiced to postman and 100% returns are taken in the SpeedNet package.



At Non Computerised Offices:



1. The procedure to be adopted for uploading booking/delivery data of non computerized offices through SPC or other computerized offices .



Booking Data:



• Articles booked at Non Computerised offices have to be sent to its SPC where the articles are supposed to be disposed to destination through Close Bag.



• SPC has to collect those articles under Receipts ->Collection of Articles with Booking Details option and enter the booking details for the articles. The office name from which the article is received has to be selected correctly.



• While saving these articles, Booking message will be created for those articles. When the communication module calls the Server, those messages will go to Central Server from where it will reflect in MIS.



Note: If the articles booked at non computerised offices are routed to SPC through other computerised linked offices, then those computerised offices also have to collect the article of non computerised offices as mentioned above. Then send the articles along with their articles to SPC for disposal.



Delivery Data of Non Computerised Office:



• SPC has to send the articles meant to be delivered at non computerised offices using the SpeedNet package. Operator has to use Delivery menu-> Invoice Articles->Articles to Other office options. ( If any linked office is not shown here, such offices have to be added in SPC site (More details on how to add additional offices at SPC site is given in the SpeedNet 3.1 Hand book supplied along with 3.1 CD and a copy of the same available inside the CD)



• SPC should collect the Delivery status of the articles sent to such offices. Non Computerised offices have to send the delivery status for those articles on daily basis to SPC.



• SPC has to enter the delivery status under Delivery menu->Remarks from other office option.



• Now the Delivery message will be created for those articles and sent to Central Server for MIS.
Email ThisBlogThis!Share to XShare to Facebook
Posted in | No comments
Newer Post Older Post Home

0 comments:

Post a Comment

Subscribe to: Post Comments (Atom)

Popular Posts

  • System Errors in Networking Meaning & Solutions
    System Errors System error 5 - Access is denied System error 5 because of firewall System error 5 when using net view command in Vista Syste...
  • Overview of SQL Server security model and security best practices
    This article discusses the security model of Microsoft SQL Server 7.0/2000 and security best practices to help you secure your data.  Securi...
  • SQL Server Security Model and Security Best Practices
    Overview of the SQL Server Security Model and Security Best Practices This article discusses the security model of Microsoft SQL Server 7.0 ...
  • List of PC Error Messages and Solutions
    You may came across of different error messages while using computer.Some are easy to understand and some are difficult.You wonder how to so...
  • Comman Run Time Errors and meaning
    Run Time Error 5 Illegal function call Program error, verify the program has all the latest updates. If updated try reinstalling the progr...
  • Schedule - MEGHDOOT SERVICE PACK-1 ISSUES
    As per the Directorate instructions, PLI/RPLi premium is segregated in First Year Premium and Renewal Premium. This segregation happens o...
  • Top 10 security enhancements in SQL Server 2005
    As database systems continue to be more widely used to back stores of networked applications, it is increasingly necessary to focus on secur...
  • Pen Drive Recovery Tool
    Find below the Online recovery tool for the Transcend pendrives. A very good tool to recover the data or format the corrupted pendrives. 1) ...
  • Speednet Communication problem
    At the very outset, confirm the following and then proceed with further instructions. • Login to www.indiapost.gov.in/spc site and confirm t...
  • How to watch online TV?
    I know we all are busy with our daily work, we do not have to time to tally our accounts or do our regular work also. Some times we want to ...

Categories

  • Computer Guidelines
  • Customer Care
  • DB Tools
  • Drivers
  • Entertainments
  • FAQ
  • For System Administrators
  • FTP
  • General Informations
  • General Knowledge
  • Guidelines
  • Hardwares
  • Health Tips
  • Internet Tips
  • Latest Software Updates
  • Network Trouble shooting
  • Printer Trouble shooting
  • Printing Tips
  • Recovery Tips
  • Registry Tips
  • Registry Tools
  • Security Guidelines
  • Security Tips
  • Software Tips
  • Softwares
  • SQL
  • Technology
  • Tips and Tricks
  • Tools
  • Trouble shooting
  • Useful Softwares
  • Utilities
  • Virus Solutions
  • Websites
  • windows 7
  • Windows Server
  • Windows Tips
  • Windows Vista
  • Windows XP FAQ

Blog Archive

  • ►  2011 (138)
    • ►  May (32)
    • ►  April (24)
    • ►  March (29)
    • ►  February (15)
    • ►  January (38)
  • ▼  2010 (241)
    • ►  December (55)
    • ►  November (40)
    • ►  October (21)
    • ►  September (35)
    • ►  August (39)
    • ►  July (23)
    • ►  June (5)
    • ►  May (2)
    • ▼  April (12)
      • Schedule - MEGHDOOT SERVICE PACK-1 ISSUES
      • How to enable the use of 'Ad Hoc Distributed Queri...
      • Procedure for running interest calculation ( for t...
      • DB TOOLS
      • Windows system key combinations
      • Network / USB Printing Solutions
      • Virus - Solutions
      • Microsoft Office Shortcut Keys
      • Supplementary Solution - 01/04/2010
      • SQL Server 2005 - Schedule Backup
      • Speednet Communication problem
      • Easy process for booking hardware compalint to HP:
    • ►  March (4)
    • ►  February (2)
    • ►  January (3)
  • ►  2009 (26)
    • ►  December (5)
    • ►  November (3)
    • ►  October (4)
    • ►  September (5)
    • ►  August (3)
    • ►  July (5)
    • ►  June (1)
Powered by Blogger.

About Me

Unknown
View my complete profile